EL CAMINO REAL over COW BAYOU & CANAL
0.1 MI E OF HERCULES · County 201, Texas · Built 2011 · 4 Lanes · 6,000 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
29.550414, -95.111658
This bridge is in worse condition than 14% of bridges in County 201. The average bridge in Texas is 0 years old; this one is 15 years old.
Nearby Bridges
MEDICAL CTR BLVD over HCFCD DITCH
Built 1983
NASA 1 WBFR over COW BAYOU
Built 2008
E. Nasa Pkwy over HL&P DISCHARGE DITCH #1
Built 1960
NASA RD 1 over FM 270 & COW BAYOU
Built 2008
NASA 1 EBFR over COW BAYOU
Built 2008
NASA RD 1 over SARAH DEEL DR
Built 2008
GEMINI AVE over HCFCD DITCH
Built 1983
E NASA Parkway over HL&P DISCHARGE DITCH #2
Built 1960
FEATHER CRAFT LN over HCFCD DITCH
Built 1986
KNIGHTS BRIDGE LN over HL&P COOLING WATER CANAL
Built 2005
Bridge Details
- Structure #
- 121020AA3265001
- Year Built
- 2011
- Length
- 35.1 m (115.2 ft)
- Max Span
- 35.1 m
- Width
- 23.5 m (77.1 ft)
- Lanes
- 4
- Daily Traffic
- 6,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $169,000
- Total Project Cost
- $211,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.