BW 8 WB over FAIRBANKS N HOUSTON
0.80 MI W OF SH 249 · County 201, Texas · Built 1989 · 6 Lanes · 28,500 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
29.935881, -95.529406
This bridge is in worse condition than 54.5% of bridges in County 201. The average bridge in Texas is 0 years old; this one is 37 years old.
Nearby Bridges
BW 8 EB over FAIRBANKS N HOUSTON
Built 1989
BW 8 EB over HCFCD DRAINAGE DITCH
Built 1990
BWY 8 EBFR over HCFCD DRAINAGE DITCH
Built 1989
BWY 8 WBFR over HCFCD DRAINAGE DITCH
Built 1989
BW 8 WB over HCFCD DRAINAGE DITCH
Built 1990
BW 8 WBFR over BNSF RR
Built 1990
BW 8 EB over BN & CRI&P RR & SH 249
Built 1990
BW 8 EBFR over BNSF RR
Built 1990
SH 249 SB/BW 8 WB over BW 8 WB FR & Railroad
Built 2016
BW 8 WB over BN & CRI&P RR & SH 249
Built 1989
Bridge Details
- Structure #
- 121020325601252
- Year Built
- 1989
- Reconstructed
- 2015
- Length
- 85 m (278.9 ft)
- Max Span
- 36 m
- Width
- 28.7 m (94.2 ft)
- Lanes
- 6
- Daily Traffic
- 28,500
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- Local Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.