BW 8 EB over FAIRBANKS N HOUSTON

0.80 MI W OF SH 249 · County 201, Texas · Built 1989 · 5 Lanes · 28,500 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
121020325601251
Year Built
1989
Reconstructed
2003
Length
85 m (278.9 ft)
Max Span
36 m
Width
25.3 m (83 ft)
Lanes
5
Daily Traffic
28,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.