SH 249 SB/BW 8 WB over BW 8 WB FR & Railroad
SH 249/BW 8 INTERCHANGE · County 201, Texas · Built 2016 · 1 Lanes · 20,872 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
29.940628, -95.521642
This bridge is in worse condition than 54.5% of bridges in County 201. The average bridge in Texas is 0 years old; this one is 10 years old.
Nearby Bridges
SH 249 SB/BW 8 EB over SH 249/BW 8
Built 2005
BW 8 WBFR over BNSF RR
Built 1990
BW 8 EB over BN & CRI&P RR & SH 249
Built 1990
BW 8 EB SH 249 NB over SH 249 and BNSF RR
Built 2005
BW 8 EBFR over BNSF RR
Built 1990
BW 8 WB over BN & CRI&P RR & SH 249
Built 1989
SH 249 over BURLINGTON NORTHERN RR
Built 1993
SH 249 NB over BW 8 FR
Built 1989
SH 249 SB over BELTWAY 8 FR
Built 1989
BW 8 WB over FAIRBANKS N HOUSTON
Built 1989
Bridge Details
- Structure #
- 121020072003395
- Year Built
- 2016
- Length
- 1507.8 m (4946.9 ft)
- Max Span
- 76.5 m
- Width
- 8.8 m (28.9 ft)
- Lanes
- 1
- Daily Traffic
- 20,872
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- Local Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.