IH 45 NB over EL DORADO BLVD
4.80 MI SE OF BW 8 · County 201, Texas · Built 2016 · 7 Lanes · 68,159 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
29.553581, -95.153825
This bridge is in worse condition than 14% of bridges in County 201. The average bridge in Texas is 0 years old; this one is 10 years old.
Nearby Bridges
IH 45 SB over EL DORADO BLVD
Built 2016
IH 45 over HCFCD Ditch A119-02-00
Built 2016
BAY AREA BLVD over HCFCD DITCH
Built 1978
IH 45 SB over BAY AREA BLVD
Built 2016
IH 45 NB over BAY AREA BLVD
Built 2016
PEBBLESHIRE DR over HCFCD DITCH
Built 1978
IH 45 SB ML & HOV over FM 2351(Clear Lake City)
Built 2016
IH 45 NB ML over FM 2351(Clear Lake City)
Built 2016
EL DORADO BLVD SB over HCFCD
Built 2009
EL DORADO BLVD NB over HCFCD
Built 2009
Bridge Details
- Structure #
- 121020050003444
- Year Built
- 2016
- Length
- 103.3 m (338.9 ft)
- Max Span
- 36.3 m
- Width
- 39.4 m (129.3 ft)
- Lanes
- 7
- Daily Traffic
- 68,159
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.