EL DORADO BLVD SB over HCFCD
0.3 MI E. OF BLACKHAWK · County 201, Texas · Built 2009 · 2 Lanes · 1,100 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
29.536664, -95.170417
This bridge is in worse condition than 14% of bridges in County 201. The average bridge in Texas is 0 years old; this one is 17 years old.
Nearby Bridges
EL DORADO BLVD NB over HCFCD
Built 2009
BLACKHAWK BLVD over CEDAR GULLY
Built 1970
Blackhawk Blvd over Cedar Gully
Built 1970
BAY AREA BLVD over HCFCD DITCH
Built 1978
WHISPERING PINES over CLEAR CRK
Built 1988
Bay Area Blvd over HCFCD Ditch
Built 1985
FM 528 over CLEAR CREEK
Built 1996
FM 2351 over HCFCD DITCH K
Built 1992
IH 45 SB over EL DORADO BLVD
Built 2016
IH 45 NB over EL DORADO BLVD
Built 2016
Bridge Details
- Structure #
- 121020AA2087002
- Year Built
- 2009
- Length
- 27.4 m (89.9 ft)
- Max Span
- 9.1 m
- Width
- 10.5 m (34.4 ft)
- Lanes
- 2
- Daily Traffic
- 1,100
- Material
- Prestressed Concrete
- Design
- Other
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.