CR 108 (MAX RD) SB over HICKORY SLOUGH

0.55 MI N OF FM 518 · County 039, Texas · Built 2018 · 2 Lanes · 840 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
120200M00395002
Year Built
2018
Length
18.3 m (60 ft)
Max Span
18.3 m
Width
12.7 m (41.7 ft)
Lanes
2
Daily Traffic
840
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.