OLD CHOC BYU RD over DETENTION DITCH

0.80 MI N OF BAILEY AVE · County 039, Texas · Built 1985 · 2 Lanes · 3,729 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
120200AA0564004
Year Built
1985
Length
19.5 m (64 ft)
Max Span
18.9 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
3,729
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$3,000
Total Project Cost
$4,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.