CR 89 over SOUTH FORK MARYS CREEK

0.30 MI N OF BAILEY AVE · County 039, Texas · Built 2004 · 2 Lanes · 3,729 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
120200AA0564001
Year Built
2004
Length
9.1 m (29.9 ft)
Max Span
4.6 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
3,729
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$5,000
Total Project Cost
$6,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.