HATFIELD RD over HICKORY SLOUGH
1.20 MI N OF FM 518 · County 039, Texas · Built 2012 · 2 Lanes · 1,250 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
29.576975, -95.308061
This bridge is in worse condition than 28.3% of bridges in County 039. The average bridge in Texas is 0 years old; this one is 14 years old.
Nearby Bridges
ODAY RD over HICKORY SLOUGH
Built 2012
CR 109 (GARDEN RD) over HICKORY SLOUGH
Built 1996
MYKAWA RD over HICKORY SLOUGH
Built 2004
McHARD RD over BNSF RR & HICKORY SLOUGH
Built 1999
CR 105 (ROY RD) over HICKORY SLOUGH
Built 2012
SH 35 over TOWN DITCH
Built 2012
SH 35 over HICKORY SLOUGH
Built 2012
MYKAWA RD NB over CLEAR CREEK
Built 1989
MYKAWA RD SB over CLEAR CREEK
Built 1989
CR 108 (MAX RD) SB over HICKORY SLOUGH
Built 2018
Bridge Details
- Structure #
- 120200M01095001
- Year Built
- 2012
- Length
- 19.8 m (65 ft)
- Max Span
- 10.7 m
- Width
- 8.6 m (28.2 ft)
- Lanes
- 2
- Daily Traffic
- 1,250
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $6,000
- Total Project Cost
- $8,000