FM 521 over MCFADDEN SLOUGH
1.60 MI N OF SH 332 · County 039, Texas · Built 1956 · 2 Lanes · 4,943 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
29.076922, -95.554058
This bridge is in worse condition than 69.8% of bridges in County 039. The average bridge in Texas is 0 years old; this one is 70 years old.
Nearby Bridges
SH 332 RAMP C over UP RAILROAD
Built 2010
SH 332 RAMP B over NATURAL GROUND
Built 2011
SH 332 RAMP A over NATURAL GROUND
Built 2011
SH 332 (FM 521) over BRAZOS RIVER & UP RR
Built 2010
SH 35 over MILLS BAYOU
Built 1991
SH 35 EB over MIDDLE BAYOU
Built 2005
SH 35 WB over MIDDLE BAYOU
Built 2006
CR 520 over DRAW
Built 2010
SH 332 over BUFFALO CAMP BAYOU
Built 1961
FM 521 over SAN BERNARD RIVER
Built 1960
Bridge Details
- Structure #
- 120200084703011
- Year Built
- 1956
- Reconstructed
- 2004
- Length
- 28.1 m (92.2 ft)
- Max Span
- 9.2 m
- Width
- 14.1 m (46.3 ft)
- Lanes
- 2
- Daily Traffic
- 4,943
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $5,000
- Total Project Cost
- $6,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.