FM 521 over SAN BERNARD RIVER
2.50 MI S OF SH 36 · County 039, Texas · Built 1960 · 2 Lanes · 9,726 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
29.0109, -95.588644
This bridge is in worse condition than 69.8% of bridges in County 039. The average bridge in Texas is 0 years old; this one is 66 years old.
Nearby Bridges
CR 520 over DRAW
Built 2010
SH 332 (FM 521) over BRAZOS RIVER & UP RR
Built 2010
SH 332 RAMP A over NATURAL GROUND
Built 2011
SH 332 RAMP B over NATURAL GROUND
Built 2011
SH 332 RAMP C over UP RAILROAD
Built 2010
FM 2611 over COCKLEBUR SLOUGH
Built 1957
FM 2611 over SAN BERNARD RVR CR 659
Built 2022
CR 334 over UNNAMED CREEK
Built 2021
FM 521 over MCFADDEN SLOUGH
Built 1956
CR 400 over DRAINAGE DITCH
Built 1989
Bridge Details
- Structure #
- 120200100401006
- Year Built
- 1960
- Reconstructed
- 2005
- Length
- 268.5 m (880.9 ft)
- Max Span
- 42.7 m
- Width
- 14 m (45.9 ft)
- Lanes
- 2
- Daily Traffic
- 9,726
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $490,000
- Total Project Cost
- $613,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.