SH 332 over BUFFALO CAMP BAYOU

0.40 MI W OF FM 2004 · County 039, Texas · Built 1961 · 2 Lanes · 11,311 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
120200152401004
Year Built
1961
Reconstructed
1998
Length
74.4 m (244.1 ft)
Max Span
9.2 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
11,311
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$134,000
Total Project Cost
$168,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.