SH 175 over SALT CREEK
1.4 MI N OF SH 59 · County 337, Texas · Built 1987 · 2 Lanes · 2,485 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.685075, -97.724003
This bridge is in worse condition than 28% of bridges in County 337. The average bridge in Texas is 0 years old; this one is 39 years old.
Nearby Bridges
SH 59 over RITCHIE CREEK
Built 1986
CR 382/CATHOLICCEM over RITCHIE CREEK
Built 2003
SH 175 over SALT CREEK
Built 1990
CR 272/ROCK SPGSCH over BARREL SPRINGS CREEK
Built 1990
CR 300/WOODS RD over BARREL SPRING CREEK
Built 1921
CR 272/ROCK SPGSCH over EAST BELKNAP CREEK
Built 2004
CR 272/Rock Spring over Salt Creek
Built 2020
FM 1806 over DRAW
Built 2006
CR 278/HILDRETH PL over EAST BELKNAP CREEK
Built 1993
CR 272/ROCK SPGSCH over EAST BELKNAP CREEK
Built 1982
Bridge Details
- Structure #
- 031690023901021
- Year Built
- 1987
- Length
- 30.2 m (99.1 ft)
- Max Span
- 10.1 m
- Width
- 14.1 m (46.3 ft)
- Lanes
- 2
- Daily Traffic
- 2,485
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.