CR 272/Rock Spring over Salt Creek
0.5 MI W of SH 175 · County 337, Texas · Built 2020 · 2 Lanes · 174 vehicles/day
Overall
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 9 | Excellent |
| Substructure | 9 | Excellent |
Location
33.742636, -97.733278
This bridge is in worse condition than 23.2% of bridges in County 337. The average bridge in Texas is 0 years old; this one is 6 years old.
Nearby Bridges
SH 175 over SALT CREEK
Built 1990
CR 310/AIRPORT RD over SALT CREEK
Built 2008
CR 272/ROCK SPGSCH over BARREL SPRINGS CREEK
Built 1990
CR 301/BROOKMOLE over SALT CREEK
Built 2002
CR 300/WOODS RD over BARREL SPRING CREEK
Built 1921
CR 310/AIRPORT RD over BRANCH OF SALT CREEK
Built 1988
CR 302/LONGBRANCH over SALT CREEK
Built 1998
KIRBY RD over BARREL SPRING CREEK
Built 1999
US 82 over PANTHER CREEK
Built 1935
CR 310/AIRPORT RD over BARREL SPRINGS CREEK
Built 1992
Bridge Details
- Structure #
- 031690AA0272005
- Year Built
- 2020
- Length
- 22.9 m (75.1 ft)
- Max Span
- 22.9 m
- Width
- 7.9 m (25.9 ft)
- Lanes
- 2
- Daily Traffic
- 174
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.