CR 300/WOODS RD over BARREL SPRING CREEK
0.7 MI S OF CR 271 · County 337, Texas · Built 1921 · 1 Lanes · 32 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
33.725778, -97.765792
This bridge is in worse condition than 90.2% of bridges in County 337. The average bridge in Texas is 0 years old; this one is 105 years old.
Nearby Bridges
CR 272/ROCK SPGSCH over BARREL SPRINGS CREEK
Built 1990
KIRBY RD over BARREL SPRING CREEK
Built 1999
CR 310/AIRPORT RD over SALT CREEK
Built 2008
CR 272/Rock Spring over Salt Creek
Built 2020
SH 175 over SALT CREEK
Built 1990
CR 310/AIRPORT RD over BARREL SPRINGS CREEK
Built 1992
CR 301/BROOKMOLE over SALT CREEK
Built 2002
CR 297/EUREKA SCH over BARREL SPRINGS CREEK
Built 1985
CR 272/ROCK SPGSCH over EAST BELKNAP CREEK
Built 2004
FM 1806 over DRAW
Built 2006
Bridge Details
- Structure #
- 031690AA0300001
- Year Built
- 1921
- Reconstructed
- 1991
- Length
- 9.4 m (30.8 ft)
- Max Span
- 9.1 m
- Width
- 4.8 m (15.7 ft)
- Lanes
- 1
- Daily Traffic
- 32
- Material
- Steel
- Design
- Truss - Thru
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $30,000
- Total Project Cost
- $38,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.