BETHEL CANNON RD over DRAW
0.75 MI E OF FM 121 · County 181, Texas · Built 1989 · 2 Lanes · 120 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
33.445208, -96.457517
This bridge is in worse condition than 49.4% of bridges in County 181. The average bridge in Texas is 0 years old; this one is 37 years old.
Nearby Bridges
BETHEL CANNON RD over DRAW
Built 1987
BETHEL CANNON RD over E FORK PILOT GROVE CREEK
Built 1993
STUDEBAKER RD over E FORK PILOT GROVE CREEK
Built 2002
JOE DAVIS RD over W FORK PILOT GROVE CREEK
Built 2003
FM 121 over W FORK PILOT GROVE CREEK
Built 2017
BINION ROAD over PILOT GROVE CREEK
Built 1997
ROSE HILL RD over W FORK PILOT GROVE CREEK
Built 1989
JOE DAVIS(BALL) RD over E FORK PILOT GROVE CREEK
Built 1982
BUCK SNORT RD over DRAW
Built 1993
TAYLOR RD over PILOT GROVE CREEK
Built 2007
Bridge Details
- Structure #
- 010920AA0314002
- Year Built
- 1989
- Length
- 12.2 m (40 ft)
- Max Span
- 6.1 m
- Width
- 6.1 m (20 ft)
- Lanes
- 2
- Daily Traffic
- 120
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,000
- Total Project Cost
- $3,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.