JOE DAVIS(BALL) RD over E FORK PILOT GROVE CREEK
0.10 MI W OF PILOT GROVE · County 181, Texas · Built 1982 · 2 Lanes · 60 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
33.4608, -96.427217
This bridge is in worse condition than 49.4% of bridges in County 181. The average bridge in Texas is 0 years old; this one is 44 years old.
Nearby Bridges
CHICKEN FIELD RD over E FORK PILOT GROVE CREEK
Built 2001
STUDEBAKER RD over E FORK PILOT GROVE CREEK
Built 2002
REYNOLDS RD over E FORK PILOT GROVE CREEK
Built 1986
BETHEL CANNON RD over E FORK PILOT GROVE CREEK
Built 1993
JOE DAVIS RD over W FORK PILOT GROVE CREEK
Built 2003
ROSE HILL RD over PILOT GROVE CREEK
Built 2001
FM 121 over CONNER CREEK
Built 1954
GORDON ROAD over CONNOR CREEK
Built 1998
ROSE HILL RD over W FORK PILOT GROVE CREEK
Built 1989
BETHEL CANNON RD over DRAW
Built 1989
Bridge Details
- Structure #
- 010920AA0319001
- Year Built
- 1982
- Length
- 12.2 m (40 ft)
- Max Span
- 11.9 m
- Width
- 6.1 m (20 ft)
- Lanes
- 2
- Daily Traffic
- 60
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $43,000
- Total Project Cost
- $54,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.