BETHEL CANNON RD over DRAW
0.20 MI E OF FM 121 · County 181, Texas · Built 1987 · 2 Lanes · 110 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
33.442589, -96.465917
This bridge is in worse condition than 49.4% of bridges in County 181. The average bridge in Texas is 0 years old; this one is 39 years old.
Nearby Bridges
BETHEL CANNON RD over DRAW
Built 1989
BETHEL CANNON RD over E FORK PILOT GROVE CREEK
Built 1993
STUDEBAKER RD over E FORK PILOT GROVE CREEK
Built 2002
JOE DAVIS RD over W FORK PILOT GROVE CREEK
Built 2003
FM 121 over W FORK PILOT GROVE CREEK
Built 2017
BUCK SNORT RD over DRAW
Built 1993
BINION ROAD over PILOT GROVE CREEK
Built 1997
ROSE HILL RD over W FORK PILOT GROVE CREEK
Built 1989
ANDERSON RD over TRIB PILOT GROVE CREEK
Built 2008
TAYLOR RD over PILOT GROVE CREEK
Built 2007
Bridge Details
- Structure #
- 010920AA0314001
- Year Built
- 1987
- Length
- 7.3 m (24 ft)
- Max Span
- 7 m
- Width
- 6.1 m (20 ft)
- Lanes
- 2
- Daily Traffic
- 110
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,000
- Total Project Cost
- $1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.