US 75 NB ENT RAMP over ROW

2.3 MI S OF US 82 · County 181, Texas · Built 2022 · 2 Lanes · 7,050 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
010920004702692
Year Built
2022
Length
163 m (534.8 ft)
Max Span
32.6 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
7,050
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.