US 75 SB over LAMAR; HOUSTON; WASH. ST
2.3 MI S OF US 82 · County 181, Texas · Built 2022 · 2 Lanes · 27,250 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
33.638175, -96.616597
This bridge is in worse condition than 17.3% of bridges in County 181. The average bridge in Texas is 0 years old; this one is 4 years old.
Nearby Bridges
US 75 NB ENT RAMP over ROW
Built 2022
US 75 NB over LAMAR; HOUSTON; WASH. ST
Built 2022
US 75 SB FR over POST OAK CREEK TRIBUTARY
Built 1962
US 75 SB EXIT RAMP over WASHINGTON ST & CREEK
Built 2022
WASHINGTON ST over POST OAK CRK TRIB
Built 1962
N WOODS ST over POST OAK CREEK
Built 1984
W PECAN ST over POST OAK CREEK
Built 1949
SH 56 WB over POST OAK CREEK
Built 2001
N RICKETTS ST over POST OAK CREEK
Built 1960
SH 56 EB over POST OAK CREEK
Built 1945
Bridge Details
- Structure #
- 010920004702687
- Year Built
- 2022
- Length
- 759.9 m (2493.1 ft)
- Max Span
- 36.7 m
- Width
- 28.3 m (92.8 ft)
- Lanes
- 2
- Daily Traffic
- 27,250
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.