US 75 SB over LAMAR; HOUSTON; WASH. ST

2.3 MI S OF US 82 · County 181, Texas · Built 2022 · 2 Lanes · 27,250 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
010920004702687
Year Built
2022
Length
759.9 m (2493.1 ft)
Max Span
36.7 m
Width
28.3 m (92.8 ft)
Lanes
2
Daily Traffic
27,250
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.