US 75 NB over LAMAR; HOUSTON; WASH. ST
2.3 MI S OF US 82 · County 181, Texas · Built 2022 · 2 Lanes · 27,250 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
33.638903, -96.616244
This bridge is in worse condition than 17.3% of bridges in County 181. The average bridge in Texas is 0 years old; this one is 4 years old.
Nearby Bridges
US 75 SB over LAMAR; HOUSTON; WASH. ST
Built 2022
US 75 NB ENT RAMP over ROW
Built 2022
US 75 SB EXIT RAMP over WASHINGTON ST & CREEK
Built 2022
WASHINGTON ST over POST OAK CRK TRIB
Built 1962
US 75 SB FR over POST OAK CREEK TRIBUTARY
Built 1962
W PECAN ST over POST OAK CREEK
Built 1949
N WOODS ST over POST OAK CREEK
Built 1984
N RICKETTS ST over POST OAK CREEK
Built 1960
SH 56 WB over POST OAK CREEK
Built 2001
US 75 SB ENTR RAMP over EAST FORK POST OAK CREEK
Built 1985
Bridge Details
- Structure #
- 010920004702686
- Year Built
- 2022
- Length
- 759.9 m (2493.1 ft)
- Max Span
- 36.6 m
- Width
- 27.4 m (89.9 ft)
- Lanes
- 2
- Daily Traffic
- 27,250
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.