US 82 over TIMBER CREEK

1.6 MI W OF SH 121 · County 147, Texas · Built 1996 · 4 Lanes · 6,243 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
010750004520180
Year Built
1996
Reconstructed
2016
Length
13.7 m (44.9 ft)
Max Span
3 m
Width
57.4 m (188.3 ft)
Lanes
4
Daily Traffic
6,243
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.