US 82 over SH 121

1.0 MI W OF SH 78 · County 147, Texas · Built 1998 · 2 Lanes · 7,032 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
010750004520219
Year Built
1998
Length
86.9 m (285.1 ft)
Max Span
32 m
Width
14 m (45.9 ft)
Lanes
2
Daily Traffic
7,032
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.