SH 121 over PIG BRANCH
1.1 MI S OF US 82 · County 147, Texas · Built 1970 · 5 Lanes · 14,907 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
33.588783, -96.192461
This bridge is in worse condition than 28.8% of bridges in County 147. The average bridge in Texas is 0 years old; this one is 56 years old.
Nearby Bridges
SH 56 over POWDER CRK
Built 1933
SH 121 over S FK POWDER CREEK
Built 1974
SH 121 over POWDER CREEK REL
Built 1970
SH 56 over POWDER CRK REL
Built 1933
US 82 over TIMBER CREEK TRIBUTARY
Built 1996
US 82 over SH 121
Built 1998
US 82 WB over SH 121
Built 2021
S MAIN ST over POWDER CREEK
Built 1950
SH 78 over POWDER CREEK
Built 1938
US 82 over SH 78
Built 2001
Bridge Details
- Structure #
- 010750054901031
- Year Built
- 1970
- Reconstructed
- 2013
- Length
- 14.2 m (46.6 ft)
- Max Span
- 2.1 m
- Width
- 35.3 m (115.8 ft)
- Lanes
- 5
- Daily Traffic
- 14,907
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $132,000
- Total Project Cost
- $176,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.