FAU 8 over SPRING CREEK
1.06 MI. W OF I-75 JCT. · County 065, Tennessee · Built 1930 · 4 Lanes · 20,510 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
34.990786, -85.222003
This bridge is in worse condition than 81.3% of bridges in County 065. The average bridge in Tennessee is 0 years old; this one is 96 years old.
Nearby Bridges
NFA B889 over SPRING CREEK
Built 1955
NFA B781 over BRANCH
Built 1965
FAU 3609 over SPRING CREEK
Built 1959
FAU 3610 over SMALL STREAM
Built 2001
RAMP TO I75 NB over I-75 RAMP G
Built 2021
I24 EBL & WBL over BRANCH
Built 1960
I24 EBL TO I75 SBL over SPRING CREEK
Built 2020
FAU 3609 over SPRING CREEK RD / I-24EB
Built 2021
I75 SB over SPRING CREEK
Built 2021
I75 NB over SPRING CREEK
Built 2020
Bridge Details
- Structure #
- 33SR0080003
- Year Built
- 1930
- Reconstructed
- 1962
- Length
- 30.2 m (99.1 ft)
- Max Span
- 10.1 m
- Width
- 28.2 m (92.5 ft)
- Lanes
- 4
- Daily Traffic
- 20,510
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,193,000
- Total Project Cost
- $1,790,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.