FAU 8 over SPRING CREEK

1.06 MI. W OF I-75 JCT. · County 065, Tennessee · Built 1930 · 4 Lanes · 20,510 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
33SR0080003
Year Built
1930
Reconstructed
1962
Length
30.2 m (99.1 ft)
Max Span
10.1 m
Width
28.2 m (92.5 ft)
Lanes
4
Daily Traffic
20,510
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,193,000
Total Project Cost
$1,790,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.