I24 EBL & WBL over BRANCH

1 MI. NORTH EAST RIDGE · County 065, Tennessee · Built 1960 · 6 Lanes · 115,412 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Culvert
4
Poor

Bridge Details

Structure #
33I00240075
Year Built
1960
Length
6.9 m (22.6 ft)
Max Span
2.6 m
Width
144.7 m (474.7 ft)
Lanes
6
Daily Traffic
115,412
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$408,000
Total Project Cost
$613,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.