I24 EBL TO I75 SBL over SPRING CREEK

JUNCTION OF I75/I24 · County 065, Tennessee · Built 2020 · 3 Lanes · 115,412 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
33I00240087
Year Built
2020
Length
41.3 m (135.5 ft)
Max Span
38.6 m
Width
18.7 m (61.4 ft)
Lanes
3
Daily Traffic
115,412
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.