I75 NB TO I24WB over SPRING CREEK

AT I-75/I-24 INTERSECTION · County 065, Tennessee · Built 2020 · 2 Lanes · 110,752 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
33I00750091
Year Built
2020
Length
41.5 m (136.2 ft)
Max Span
41.5 m
Width
19.1 m (62.7 ft)
Lanes
2
Daily Traffic
110,752
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.