FAP 53 over OBEY RIVER

LEAVE CELINA CITY LIMITS · County 027, Tennessee · Built 1975 · 2 Lanes · 3,881 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
14SR0530007
Year Built
1975
Length
109.1 m (357.9 ft)
Max Span
44.2 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
3,881
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.