NFA A199 over DALE HOLLOW DAM SPILLWAY

3.5MI SE OF CELINA TN. · County 027, Tennessee · Built 1943 · 2 Lanes · 136 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
140A1990001
Year Built
1943
Reconstructed
1983
Length
126.1 m (413.7 ft)
Max Span
19.2 m
Width
6 m (19.7 ft)
Lanes
2
Daily Traffic
136
Material
Steel
Design
Girder and Floorbeam System
Owner
Corps of Engineers (Civil)
Last Inspected
N/A
Est. Improvement
$648,000
Total Project Cost
$972,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.