FAP 52 over WET WEATHER BRANCH

1.14 MI.W.OF CELINA · County 027, Tennessee · Built 2013 · 2 Lanes · 3,949 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
14SR0520018
Year Built
2013
Length
128.3 m (420.9 ft)
Max Span
43 m
Width
13.3 m (43.6 ft)
Lanes
2
Daily Traffic
3,949
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.