FAP 52 over OVERFLOW & KYLE ST (A290

IN CELINA · County 027, Tennessee · Built 1987 · 2 Lanes · 6,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
14SR0520013
Year Built
1987
Length
93.3 m (306.1 ft)
Max Span
18.9 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
6,000
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.