SUCCOTASH RD over POTTER POND CHANNEL
1.2 MI S OF JCT US 1 · County 009, Rhode Island · Built 2002 · 2 Lanes · 3,358 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
41.386014, -71.526008
This bridge is in worse condition than 8.3% of bridges in County 009. The average bridge in Rhode Island is 0 years old; this one is 24 years old.
Nearby Bridges
GREAT ISLAND RD over TIDAL FLATS INLET
Built 2016
GALILEE ESCAPE RD over POINT JUDITH POND
Built 1992
GALILEE ESCAPE RD over POINT JUDITH POND
Built 1992
US 1 SB POST RD over POND ST
Built 1963
US 1 NB POST RD over POND ST
Built 1963
US 1 SB POST RD over SILVER SPRING COVE
Built 1963
US 1 NB POST RD over SILVER SPRING COVE
Built 1963
US 1 POST RD NB over SALT POND RD
Built 1963
US 1 POST RD SB over SALT POND RD
Built 1963
SILVER LAKE AV over SAUGATUCKET RIVER
Built 1959
Bridge Details
- Structure #
- 000000000003730
- Year Built
- 2002
- Length
- 22.4 m (73.5 ft)
- Max Span
- 21.2 m
- Width
- 12.4 m (40.7 ft)
- Lanes
- 2
- Daily Traffic
- 3,358
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,694,000
- Total Project Cost
- $4,404,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.