US 1 NB POST RD over SILVER SPRING COVE

1.0 MI S OF JCT RI 108 · County 009, Rhode Island · Built 1963 · 2 Lanes · 11,243 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000004850
Year Built
1963
Length
42.1 m (138.1 ft)
Max Span
17.9 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
11,243
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,284,000
Total Project Cost
$8,539,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.