SILVER LAKE AV over SAUGATUCKET RIVER
0.6 MI W OF WOODRUFF AV · County 009, Rhode Island · Built 1959 · 2 Lanes · 1,461 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
7
Good
Superstructure
4
Poor
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 4 | Poor |
| Substructure | 4 | Poor |
Location
41.433597, -71.502272
This bridge is in worse condition than 86.9% of bridges in County 009. The average bridge in Rhode Island is 0 years old; this one is 67 years old.
Nearby Bridges
US 1A MAIN ST over SAUGATUCKET RIVER
Built 1920
US 1 NB POST RD over SILVER SPRING COVE
Built 1963
US 1 NB POST RD over POND ST
Built 1963
US 1 SB POST RD over SILVER SPRING COVE
Built 1963
US 1 SB POST RD over POND ST
Built 1963
WOODRUFF AV over NARR/S.KINGSTOWN BIKEWAY
Built 1980
US 1 POST RD NB over SALT POND RD
Built 1963
US 1 POST RD SB over SALT POND RD
Built 1963
WOODRUFF AV over US 1 POST RD
Built 1963
US 1 SB POST RD over RI 108 KING RD&PT JDH RD
Built 1962
Bridge Details
- Structure #
- 000000000005650
- Year Built
- 1959
- Length
- 21.6 m (70.9 ft)
- Max Span
- 7.6 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 1,461
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,124,000
- Total Project Cost
- $2,924,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.