PR 30 NB SB 4.1 KM over PR 189

KM 4.1 · County 063, Puerto Rico · Built 2021 · 6 Lanes · 75,000 vehicles/day

Overall
Good
Superstructure
8
Very Good
Substructure
9
Excellent

Bridge Details

Structure #
031181
Year Built
2021
Length
34.2 m (112.2 ft)
Max Span
18.3 m
Width
32.5 m (106.6 ft)
Lanes
6
Daily Traffic
75,000
Material
Prestressed Concrete Continuous
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.