PR 30 EASTBOUND over PR 931
3.7 KM N E OF CAGUAS · County 063, Puerto Rico · Built 1968 · 6 Lanes · 114,500 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
18.244444, -66.000833
This bridge is in worse condition than 60% of bridges in County 063. The average bridge in Puerto Rico is 0 years old; this one is 58 years old.
Nearby Bridges
PR 30 NB SB 4.1 KM over PR 189
Built 2021
PR 189 over GRANDE DE LOIZA RIVER
Built 1980
PR 30 5.20 KM over DIRT ROAD
Built 1968
PR 203 over PR 30
Built 1997
PR 30 WESBD 3.2 KM over DIRT ROAD
Built 1968
PR 30 5.50 KM over CREEK
Built 1968
PR 203 Km. 1.10 over Local Road Km. 0.01
Built 2008
PR-30 over GRANDE DE LOIZA RIVER
Built 2000
PR 30 WESTBOUND over PR 932
Built 1968
PR 30 EASTBOUND over PR 932
Built 1968
Bridge Details
- Structure #
- 009801
- Year Built
- 1968
- Length
- 32.4 m (106.3 ft)
- Max Span
- 12.3 m
- Width
- 34.4 m (112.9 ft)
- Lanes
- 6
- Daily Traffic
- 114,500
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $284,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.