PR 30 EABD 1.75 KM over CAGUITAS RIVER
3 KM NORTH EAST OF CAGUAS · County 025, Puerto Rico · Built 1968 · 2 Lanes · 78,200 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
18.251061, -66.023403
This bridge is in worse condition than 20% of bridges in County 025. The average bridge in Puerto Rico is 0 years old; this one is 58 years old.
Nearby Bridges
PR 32 6.2 KM over CAGUITAS RIVER
Built 1978
OFF PR 796 7.4 KM over BAIROA RIVER
Built 1989
PR 30 0.95 KM over BAIROA RIVER
Built 1968
PR 30 0.8 KM over PR 796 7.4 KM
Built 1968
RFL CO AVE 0.01 KM over PR 30 2.9 KM
Built 1978
PR-30 over GRANDE DE LOIZA RIVER
Built 2000
PR 30 WESBD 3.2 KM over DIRT ROAD
Built 1968
PR 1 32.7 KM over BAIROA RIVER
Built 1947
BAIROA AV 0.2 KM over BAIROA RIVER
Built 1960
PR 1 over CAGUITAS RIVER
Built 1953
Bridge Details
- Structure #
- 009901
- Year Built
- 1968
- Reconstructed
- 2002
- Length
- 65.6 m (215.2 ft)
- Max Span
- 21.9 m
- Width
- 33.5 m (109.9 ft)
- Lanes
- 2
- Daily Traffic
- 78,200
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,285,000
- Total Project Cost
- $6,428,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.