RFL CO AVE 0.01 KM over PR 30 2.9 KM
3 KM NORTH EAST OF CAGUAS · County 025, Puerto Rico · Built 1978 · 5 Lanes · 4,700 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
18.260522, -66.026281
This bridge is in worse condition than 42.1% of bridges in County 025. The average bridge in Puerto Rico is 0 years old; this one is 48 years old.
Nearby Bridges
PR 30 0.95 KM over BAIROA RIVER
Built 1968
PR 30 0.8 KM over PR 796 7.4 KM
Built 1968
PR 30 EABD 1.75 KM over CAGUITAS RIVER
Built 1968
RAMP PR30 TO PR 52 over URBAN CITY STREET
Built 1976
PR 1 32.7 KM over BAIROA RIVER
Built 1947
BAIROA AV 0.2 KM over BAIROA RIVER
Built 1960
OFF PR 796 7.4 KM over BAIROA RIVER
Built 1989
PR 30 over PR 1
Built 1968
PR 52 over PR 1 RAMAL
Built 1964
PR 32 6.2 KM over CAGUITAS RIVER
Built 1978
Bridge Details
- Structure #
- 016181
- Year Built
- 1978
- Length
- 54.4 m (178.5 ft)
- Max Span
- 26.6 m
- Width
- 28.1 m (92.2 ft)
- Lanes
- 5
- Daily Traffic
- 4,700
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $363,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.