PR 52 over PR 1 RAMAL
INT PR 1 AND PR 1R CAGUAS · County 025, Puerto Rico · Built 1964 · 6 Lanes · 102,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
18.264539, -66.038619
This bridge is in worse condition than 20% of bridges in County 025. The average bridge in Puerto Rico is 0 years old; this one is 62 years old.
Nearby Bridges
PR 30 over PR 1
Built 1968
RAMP PR30 TO PR 52 over URBAN CITY STREET
Built 1976
PR 52 over 64 A STREET
Built 1964
RAMP PR 52 TO PR 1 over PR 1
Built 1976
BAIROA AV 0.2 KM over BAIROA RIVER
Built 1960
EGN ASTR AV 1.2 KM over BAIROA RIVER
Built 1961
PR 52 over BAIROA RIVER
Built 1964
PR 1 32.7 KM over BAIROA RIVER
Built 1947
AVE PRNCPL KM 16.2 over BAIROA RIVER
Built 1973
PR 52 over LOCAL CITY STREET
Built 1964
Bridge Details
- Structure #
- 008561
- Year Built
- 1964
- Reconstructed
- 1976
- Length
- 34.5 m (113.2 ft)
- Max Span
- 32.8 m
- Width
- 39 m (128 ft)
- Lanes
- 6
- Daily Traffic
- 102,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $1,884,000
- Total Project Cost
- $2,355,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.