PR 52 over 64 A STREET

3 KM NORTH OF CAGUAS · County 025, Puerto Rico · Built 1964 · 6 Lanes · 100,100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
008571
Year Built
1964
Reconstructed
1990
Length
27.8 m (91.2 ft)
Max Span
8.3 m
Width
31.9 m (104.7 ft)
Lanes
6
Daily Traffic
100,100
Material
Concrete Continuous
Design
Slab
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.