OFF PR 612 3.7 KM over CAONILLAS RIVER

7.37 KM. N.W. OF UTUADO. · County 141, Puerto Rico · Built 2012 · 1 Lanes · 500 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Serious
Culvert
2
Critical

Bridge Details

Structure #
029631
Year Built
2012
Length
52.4 m (171.9 ft)
Max Span
1.8 m
Width
4.6 m (15.1 ft)
Lanes
1
Daily Traffic
500
Material
Steel
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.