PR-66 KM. 4.90 over PR-853 KM. 2.00
5.5 KM SE Carolina · County 031, Puerto Rico · Built 2007 · 8 Lanes · 36,300 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
18.364117, -65.955911
This bridge is in worse condition than 16% of bridges in County 031. The average bridge in Puerto Rico is 0 years old; this one is 19 years old.
Nearby Bridges
PR 66 4.6 KM over WATERWAY
Built 2007
PR 858 0.2 KM over MARACUTO CREEK
Built 1962
PR-858 over PR-66
Built 2007
PR 66 3.8 KM over GRANDE DE LOIZA RIVER
Built 2007
PR 859 over PR 66
Built 2007
PR 3 10.8 KM over GRANDE DE LOIZA RIVER
Built 1970
PR 3 12.1 KM over PR 853 0.01 KM
Built 2010
PR-66 KM 2.40 over PR-887 KM 2.0
Built 2007
Off PR 859 At 1.45 over PR 66 KM 7.0
Built 2008
PR-66 over Local Road
Built 2008
Bridge Details
- Structure #
- 028171
- Year Built
- 2007
- Length
- 50.8 m (166.7 ft)
- Max Span
- 30 m
- Width
- 58.4 m (191.6 ft)
- Lanes
- 8
- Daily Traffic
- 36,300
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.