PR 858 0.2 KM over MARACUTO CREEK
2 KM FROM INT PR853 & · County 031, Puerto Rico · Built 1962 · 2 Lanes · 6,100 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
18.367739, -65.957278
This bridge is in worse condition than 62.7% of bridges in County 031. The average bridge in Puerto Rico is 0 years old; this one is 64 years old.
Nearby Bridges
PR 66 4.6 KM over WATERWAY
Built 2007
PR-858 over PR-66
Built 2007
PR-66 KM. 4.90 over PR-853 KM. 2.00
Built 2007
PR 66 3.8 KM over GRANDE DE LOIZA RIVER
Built 2007
PR 3 10.8 KM over GRANDE DE LOIZA RIVER
Built 1970
PR 859 over PR 66
Built 2007
PR 3 12.1 KM over PR 853 0.01 KM
Built 2010
PR-66 KM 2.40 over PR-887 KM 2.0
Built 2007
Off PR 859 At 1.45 over PR 66 KM 7.0
Built 2008
PR 66 over PR 887
Built 2008
Bridge Details
- Structure #
- 010571
- Year Built
- 1962
- Length
- 36.2 m (118.8 ft)
- Max Span
- 14.3 m
- Width
- 10.1 m (33.1 ft)
- Lanes
- 2
- Daily Traffic
- 6,100
- Material
- Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $372,000
- Total Project Cost
- $550,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.