PR 3 10.8 KM over GRANDE DE LOIZA RIVER
0.5 KM S E OF CAROLINA · County 031, Puerto Rico · Built 1970 · 8 Lanes · 48,400 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
18.375514, -65.951833
This bridge is in worse condition than 62.7% of bridges in County 031. The average bridge in Puerto Rico is 0 years old; this one is 56 years old.
Nearby Bridges
PR 3 12.1 KM over PR 853 0.01 KM
Built 2010
PR 858 0.2 KM over MARACUTO CREEK
Built 1962
PR-66 KM. 4.90 over PR-853 KM. 2.00
Built 2007
PR 66 4.6 KM over WATERWAY
Built 2007
PR-858 over PR-66
Built 2007
PR 859 over PR 66
Built 2007
PR 66 3.8 KM over GRANDE DE LOIZA RIVER
Built 2007
Off PR 859 At 1.45 over PR 66 KM 7.0
Built 2008
PR-66 KM 2.40 over PR-887 KM 2.0
Built 2007
DR SANCHEZ CASTANO over BLASINA CREEK
Built 1977
Bridge Details
- Structure #
- 012001
- Year Built
- 1970
- Reconstructed
- 1984
- Length
- 239.8 m (786.7 ft)
- Max Span
- 35 m
- Width
- 30.6 m (100.4 ft)
- Lanes
- 8
- Daily Traffic
- 48,400
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $14,309,000
- Total Project Cost
- $17,886,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.