PR 880 over RAILROAD
0.6 MT FROM PR 2 AT 7.5 · County 061, Puerto Rico · Built 2000 · 2 Lanes · 5,300 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
18.392, -66.119861
This bridge is in worse condition than 17.5% of bridges in County 061. The average bridge in Puerto Rico is 0 years old; this one is 26 years old.
Nearby Bridges
PR 20 over PR 21
Built 1997
LOCAL ROAD over PR 177 1.95 KM
Built 1991
RUIZ SOLER AVE. over RAILROAD
Built 2000
PR 177 over PR 20 (MRTNZ. NADAL EXP)
Built 1976
RAMP FROM PR 20 S over PR 21
Built 1997
PR 20 TO PR 177 over PR 19 & RAILROAD
Built 1997
PR 20 1.9 KM over PR 19 & RAILROAD 0.2
Built 1997
RAMP 20 TO PR 177 over LOCAL ROAD URBAN TRAIN
Built 1997
PR 20 1.2 KM over PR 17 PI%ERO AVE 7.7 KM
Built 1989
PR 20 over GONZALEZ GIUSTY AVE.
Built 1983
Bridge Details
- Structure #
- 026681
- Year Built
- 2000
- Length
- 14.2 m (46.6 ft)
- Max Span
- 12.4 m
- Width
- 14.2 m (46.6 ft)
- Lanes
- 2
- Daily Traffic
- 5,300
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.