RUIZ SOLER AVE. over RAILROAD

0.4 MT FROM PR 2 AT 8.0 · County 021, Puerto Rico · Built 2000 · 2 Lanes · 1,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
026671
Year Built
2000
Length
19.1 m (62.7 ft)
Max Span
10.4 m
Width
20.4 m (66.9 ft)
Lanes
2
Daily Traffic
1,000
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.