PR 20 over GONZALEZ GIUSTY AVE.

1 KM SOUTH INT PR2 & · County 061, Puerto Rico · Built 1983 · 4 Lanes · 28,817 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
018011
Year Built
1983
Length
168.4 m (552.5 ft)
Max Span
27.3 m
Width
28.4 m (93.2 ft)
Lanes
4
Daily Traffic
28,817
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$4,810,000
Total Project Cost
$6,012,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.