PR 119 over CAMUY RIVER
2 KM EAST OF CAMUY · County 027, Puerto Rico · Built 1991 · 2 Lanes · 12,900 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
18.483483, -66.838697
This bridge is in worse condition than 0% of bridges in County 027. The average bridge in Puerto Rico is 0 years old; this one is 35 years old.
Nearby Bridges
PR 4491 over CAMUY RIVER
Built 1942
PR 2 88.9 KM over CAMUY RIVER & LOCAL
Built 1987
PR 2 over UNNAMED CREEK
Built 1990
PR 130 over DEPRESSION
Built 1990
PR 119 over PR 2
Built 1990
PR 22 over PR 2
Built 1980
URBAN LOCAL ROAD over PR 22
Built 1980
PR 493 over SECA CREEK
Built 1968
PR 485 3.7 KM over BELLACA CREEK
Built 1976
PR 493 over PR 22
Built 1980
Bridge Details
- Structure #
- 022571
- Year Built
- 1991
- Length
- 26.1 m (85.6 ft)
- Max Span
- 12 m
- Width
- 15.3 m (50.2 ft)
- Lanes
- 2
- Daily Traffic
- 12,900
- Material
- Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $80,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.